Increase your chances of passing the ISTQB ATTA exam questions on your first try. Practice with our free online ATTA exam mock test designed to help you prepare effectively and confidently.
Consider the pseudo code provided below:

Given the following tests, what additional test(s) (if any) would be needed in order to achieve 100% statement
coverage, with the minimum number of tests?
Test 1: A = 7, B = 7, Expected output: 7
Test 2: A = 7, B = 5, Expected output: 5
Which of the following statements BEST describes how tools support model-based testing?
Which TWO of the following statements about Maintainability testing are TRUE?
A) It should start as soon as the draft design documents are available for review
B) An application can be considered maintainable when static analysis and code review defects have been
fixed
C) It tests the regression impact of software or environmental changes to an operational system
D) It can be performed during Operational Acceptance Testing by multiple departments
E) It can be performed during User Acceptance Testing to ensure business processes can be maintained
Subject to testing is a software system (COTS) for Project Administration and Control (PACS). PACS is a
multi-project system for controlling the project time, e.g., in terms of scheduling and tracking, and managing
the productivity of projects, e.g., in terms of effort and deliverables.
During various interviews with stakeholders the following information was gathered:
• Using PACS is not business critical. There is no impact such as high financial losses or problems to the
operational continuity of an organization. Its application is not critical since the software package does not
support directly the operational, or the primary, business processes of an organization. It supports (project)
management in the project planning and tracking process. Of course, it will be highly annoying for users if the
system “goes down” from time to time. Although this does not have a high impact for the business process as a
whole, the Mean Time Between Failures (MTBF) still needs to be at a good level to be successful in the
market.
• Users of PACS typically have an academic educational level, but have no prior experience with this
particular type of project management software. The system will be used by a large number of users within an
organization.
• The system will be used on a regular basis, e.g., several times per day by project managers and several times
per week by project employees. This means that the system will not be used very intensively, often only for
some data input or an information request. Its usage is not considered to be very time-critical.
• The data is recorded on-line and real-time. The system is expected to run in multiple hardware environments
in various network environments. It is also expected that changes in the operational environments will happen
in the upcoming period that also need to be supported.
Based on the information provided by the stakeholder, which combination of non-functional quality
characteristics should you propose to test as part of your test approach?
What is the value of statement coverage achieved by test case 1 from test set A?
© Copyrights FreeMockExams 2026. All Rights Reserved
We use cookies to ensure that we give you the best experience on our website (FreeMockExams). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreeMockExams.