When calculating the power demand of a UPS (Uninterruptible Power Supply) system, only the backend capacity needs to be considered, and redundancy for the load does not need to be accounted for, while the capacity of the battery can be ignored.
Regarding the use of circuit breakers, which of the following descriptions are correct?
According to GB50174-2017, data centers using chilled water cooling systems should have thermal storage devices, with storage time meeting operational needs. Is this correct?
Adjusting the high air temperature at the end of the cooling system can effectively reduce the energy consumption of the cooling system and lower the PUE (Power Usage Effectiveness) value.
What are the primary components of a data center's typical energy consumption?