Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.
Common and Special Cause ______________ are the focus of Statistical Process Control.
Screening experiments are the proper choice when a Belt is faced with the situation of highly Fractional Factorial Designs.
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.
The validity of the decision made with Hypothesis Testing is dependent upon all of these except ___________________.