In new construction, when would be the appropriate time to schedule an on-site review of wall blocking for an artwork package?
Who conducts post-occupancy evaluation interviews?
During demolition, the contractor discovers dry rot in some existing walls that are to remain. After reaching an agreement with the client and contractor on a solution, what should be issued before construction continues?
A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?
Which characteristic of a water closet is MOST likely to impact the partition layout?